For General Contractors · Nationwide

Construction Scheduling Consultant for General Contractors: Schedules Approved the First Time

Primavera P6 and MS Project CPM scheduling services, owner's representative support, and construction management from one firm, for federal, state, utility, data center, and commercial projects in every U.S. region.

Get My Flat-Fee Quote ↓

Agency-ready schedules · Flat-fee pricing · Unlimited baseline revisions until approved

“Our schedule was approved with no penalties, and payments continued.”
Jason RuppertJason Ruppert, Vice President
Royce Construction Services, LLC · USMA Public Health Clinic, West Point, NY

Get Your Flat-Fee Quote

Send your specs or the schedule that was rejected. A senior scheduler reviews every request.

    • ✓ Flat-fee quote within 24 hours
    • ✓ Your files stay confidential. We'll sign your NDA.
    • ✓ Prefer to talk? (833) 777-6276
    “Our schedule was approved with no penalties, and payments continued.”
    Jason RuppertJason Ruppert, Vice President
    Royce Construction Services, LLC · USMA Public Health Clinic, West Point, NY

    General contractors who trust our schedules

    • Royce Construction Services
    • Hunt Builders Corporation
    • Kellogg & Kimsey
    • Donlar Construction
    • Waynesboro Construction
    • Terra Site Constructors
    • Trevino Group
    • Ratcliff Construction
    • Pavkov Contracting
    • Blue Yonder Inc.
    • Place Services

    Projects delivered for USACE · NAVFAC · Veterans Affairs · National Park Service · U.S. Army · State DOTs · Public school districts

    One Accountable Scheduling Team for Every Region You Build In

    You need a schedule the owner approves the first time, so you can mobilize on time and get paid for the work in place. The same senior team builds your baseline, runs your monthly updates, and defends your time extensions, from our St. Augustine, Florida headquarters or onsite when your project calls for it.

    Why schedules get rejected

    A Rejected Schedule Stops Your Project Before the Work Does

    Every owner and agency reviews schedules differently. When yours misses their requirements, the cost lands on your cash flow, not theirs.

    Baselines rejected at review

    Missing logic, constraints, cost loading, or agency-specific requirements send the schedule back, and mobilization waits.

    Payments held over updates

    Late or non-compliant monthly updates give the owner a reason to withhold progress payments.

    Delays with no defensible TIA

    Without a sound Time Impact Analysis, extensions are denied and liquidated damages become real.

    Your PM doing two jobs

    Project managers fight P6 at night instead of running the job, and owner trust slips with every resubmittal.

    Without expert support

    • ✕ Mobilization delayed by baseline rejections
    • ✕ Progress payments withheld
    • ✕ Time extensions denied
    • ✕ Disputes, claims, and liquidated damages

    With Leopard Project Controls

    • ✓ Mobilize on time with an approved baseline
    • ✓ Owner payments released on schedule
    • ✓ Time Impact Analyses that get approved
    • ✓ Milestones met, clean closeout

    Contractors should be judged on the work they build, not on the formatting of their schedule.

    How we keep your schedule approved

    Construction Scheduling Services, Owner's Rep Support, and Construction Management in One Firm

    We have sat on both sides of the review, building contractor schedules and reviewing them for the government, so we know what reviewers reject.

    CPM Scheduling Consultant

    • ✓ Baseline schedule development
    • ✓ Monthly progress updates & narratives
    • ✓ Time Impact Analysis & delay claims
    • ✓ Recovery & lookahead schedules
    • ✓ Cost loading, SOV alignment & earned value
    Explore CPM scheduling services →

    Owner's Representative Company

    • ✓ Owner-side schedule review & acceptance
    • ✓ Critical path & logic assessments
    • ✓ Delay & claim evaluation
    • ✓ Pay application & progress verification
    • ✓ Executive reporting for owners
    Explore owner's rep services →

    Construction Management Services

    • ✓ Procurement & long-lead tracking
    • ✓ Risk logs & mitigation planning
    • ✓ Commissioning & turnover sequencing
    • ✓ Cash-flow forecasting & KPI dashboards
    • ✓ Remote or onsite project support
    Discuss construction management →

    Recent federal work

    Project Controls Consultant for Federal, Utility, Data Center, and Commercial Projects

    Recent agency projects where our team worked inside each owner's scheduling specifications, review cycles, and reporting requirements.

    USACE · Department of Defense

    USMA Public Health Clinic

    West Point, New York
    Client: Royce Construction Services, LLC

    Cost-loaded P6 recovery schedule, Time Impact Analyses, monthly updates, and CLIN-based cost and commissioning reporting.

    Result: Schedule approved with no penalties, and progress payments continued.

    USACE · Omaha District

    Fort Randall Dam Major Unit Rehabilitation

    Pickstown, South Dakota
    Client: Paragon, on behalf of USACE

    Owner-side CPM schedule review: monthly update assessments, critical path and logic review, and delay and claim evaluation.

    Result: Every monthly update reviewed on cycle, with documented corrective actions for the owner.

    Veterans Affairs

    EHRM Infrastructure Upgrades

    Houston VA Medical Center, Texas
    Client: Trevino Group

    Cost-loaded baseline schedule aligned to the schedule of values, followed by monthly progress updates.

    Result: Cost-loaded baseline accepted; monthly pay applications processed against the SOV.

    VA / DoD

    Surgical HVAC System Upgrade

    Lovell FHCC, North Chicago, Illinois
    Client: Blue Yonder Inc.

    Baseline schedule development and revisions for HVAC replacement in an operating hospital.

    Result: Baseline accepted after agency review comments were resolved.

    National Park Service

    Laurel Falls Project

    Great Smoky Mountains National Park, Tennessee
    Client: Pavkov Contracting

    Baseline reschedule addressing agency comments, monthly updates, and fragnet-based TIAs.

    Result: Agency comments resolved; TIAs prepared to support the contractor's request for equitable adjustment.

    NAVFAC Southeast

    Building 761 Boat Shed & Fire Suppression

    Naval Station Guantanamo Bay, Cuba
    Client: Ratcliff Construction, Inc.

    Design-build schedule updates and SOV reporting, plus water main replacement scheduling at the same installation.

    Result: Schedule updates and SOV reports accepted each pay period.

    Sectors we serve

    • Federal & State Agency
      USMA Public Health Clinic, NY
    • Utilities & Infrastructure
      Fort Randall Dam, SD
    • Data Centers & Hyperscale
      Live data center expansion, Cincinnati, OH
    • Healthcare & VA
      Houston VA Medical Center, TX
    • Commercial
      Residence Inn Ormond Beach, FL

    Regions we serve

    Construction Scheduling Firm with Project Experience in Every U.S. Region

    Every engagement is managed from our Florida headquarters by the same senior team, wherever your project is located. Pick your region.

    States with recent Leopard project experience · plus Naval Station Guantanamo Bay, Cuba

    Southeast

    Headquarters

    Serving: Florida, Georgia, North Carolina, South Carolina, Alabama, Mississippi, Tennessee, Kentucky, Arkansas, Louisiana

    • Laurel Falls Project
      Great Smoky Mountains NP, TN · National Park Service
    • Replace Fire Alarm Systems
      Pensacola, FL · NAVFAC
    • Womack Army Medical Center Generator Switchgear
      Fort Liberty, NC · U.S. Army
    • Malcolm Randall VA Medical Center Stairwells
      Gainesville, FL · Veterans Affairs
    • Camp Blanding Joint Training Center
      Starke, FL · Florida Army National Guard

    Mid-Atlantic

    Serving: Maryland, Virginia, Washington D.C., Delaware, Pennsylvania, West Virginia, New Jersey

    • Emergent Parking Garage Repairs
      Huntington VA Medical Center, WV · Veterans Affairs
    • Hybrid Operating Room
      Richmond VA Medical Center, VA · Veterans Affairs
    • Veditz Building Renovation, Maryland School for the Deaf
      Frederick, MD · State of Maryland
    • Good Hope Road Side Path
      Montgomery County, MD · Public works
    • Parking Access & Revenue Control System
      Washington Dulles International Airport, VA · Aviation

    Northeast

    Serving: New York, Massachusetts, Connecticut, Rhode Island, Vermont, New Hampshire, Maine

    • USMA Public Health Clinic
      West Point, NY · USACE
    • Elmhurst Hospital Center Facade Restoration
      Queens, NY · Public healthcare
    • I-95 Welcome Center Restrooms & Pump House
      Hope Valley, RI · State of Rhode Island
    • South Battery Park, Pier A Plaza
      New York, NY · Battery Park City Authority

    Midwest & Plains

    Serving: Illinois, Ohio, Michigan, Indiana, Wisconsin, Minnesota, Iowa, Missouri, South Dakota, North Dakota, Nebraska, Kansas

    • Fort Randall Dam Major Unit Rehabilitation
      Pickstown, SD · USACE Omaha District
    • Surgical HVAC System Upgrade
      Lovell FHCC, North Chicago, IL · VA / DoD
    • Live Data Center Expansion
      Cincinnati, OH · Hunt Builders Corporation
    • Woodlane Park & Ride
      Woodbury, MN · Metro Transit

    Southwest

    Serving: Texas, Arizona, New Mexico, Oklahoma

    • EHRM Infrastructure Upgrades
      Houston VA Medical Center, TX · Veterans Affairs
    • Cimarron Groundwater Pump & Treat System
      Crescent, Logan County, OK · Groundwater remediation
    • Morningside Early Childhood Center
      Fort Worth, TX · Fort Worth ISD

    West & Pacific Northwest

    Serving: Washington, Oregon, California, Nevada, Colorado, Utah, Idaho, Montana, Wyoming, Alaska, Hawaii

    • Fire Suppression System Replacement, Building 1049
      NUWC Division Keyport, WA · U.S. Navy
    • Blast Door Refurbishment
      Naval Base Kitsap-Bangor, WA · U.S. Navy
    Outside the Continental U.S. · Naval Station Guantanamo Bay, Cuba: boat shed rehabilitation, fire suppression, and water main replacement for NAVFAC Southeast.

    How it works

    From Plans to an Approved Schedule in Three Steps

    1. 1

      Send your plans & specs

      Drawings, scheduling specifications, milestones, or the schedule that was rejected.

    2. 2

      Get a flat-fee proposal

      Clear scope, deliverables, and price within 24 hours. Draft baselines typically within 7 days.

    3. 3

      Stay approved through closeout

      Monthly updates, TIAs, and reporting that keep payments flowing until turnover.

    Not ready for a quote?

    Free Schedule Health Check

    Send your current XER and get a DCMA 14-point summary within 48 hours: what a reviewer will flag, and what to fix before you submit.

    Get My Free Health Check →

    What general contractors say

    Why General Contractors Choose Leopard as Their Scheduling Consultant Company

    “Leopard Project Controls has been a welcomed breath of fresh air, extremely well-versed, talented, and detail-oriented… we're trending ahead of schedule and back on track for substantial completion.”
    Ernest G. Floerke, Jr.Ernest G. Floerke, Jr., Project Executive
    Kellogg & Kimsey, Inc.
    “Their expertise in CPM scheduling and project controls ensured that every milestone was met, agency requirements were satisfied, and the project was delivered on time and within budget.”
    Jeff RosenJeff Rosen, Project Manager
    Waynesboro Construction · Maryland School for the Deaf
    “Seyar and his team have been helping us put together our P6 project schedule for a large $20 million Met Transit facility. They have been very helpful and extremely knowledgeable on the scheduling process.”
    Chris OsbyChris Osby, Project Manager
    Donlar Construction Company

    Both sides of the review

    We build contractor schedules and review them for owners and agencies, so we know exactly what reviewers reject.

    PSP®-certified senior schedulers

    You work directly with PSP®, PMP®, and PMI-SP® credentialed schedulers who join your OAC meetings when needed.

    Flat fee, unlimited revisions

    Transparent pricing and no change orders for baseline resubmissions within the same scope.

    20+ years, $10B+ in projects

    Led by a principal with two decades of CPM scheduling. Florida CGC1534435 · Florida Registered Engineering Company No. 38836.

    FAQ

    Questions About Working with a Remote Scheduling Firm

    Do you have an office in my region?

    Our headquarters is in St. Augustine, Florida. We support projects nationwide remotely through your OAC meetings, Procore, and shared files, and we travel onsite when the project requires it.

    Will you sign our NDA?

    Yes. We routinely sign client and owner NDAs before reviewing drawings, specifications, or schedules, and your files are never shared outside the project team.

    Do you join our OAC meetings?

    Yes. Your scheduler can join OAC and schedule review meetings by video, or in person when the project calls for it, and present updates directly to the owner.

    Can you meet USACE, NAVFAC, VA, and state DOT scheduling specifications?

    Yes. We build schedules to each agency's contract specifications, including cost loading, submittal and procurement activities, and the narrative and report formats reviewers expect.

    Do you support data center and utility projects?

    Yes. We schedule commissioning-driven work, long-lead equipment, outage windows, and live system cutovers for data center, hydropower, water, and infrastructure projects.

    How fast can you deliver a baseline schedule?

    A draft is typically shared within 7 days and a full baseline within 7–14 calendar days, depending on size, complexity, and specification requirements.

    You Run the Job. We Make Sure the Schedule Proves It.

    Leopard Project Controls gives general contractors across the U.S. a construction scheduling consultant, owner's representative company, and construction management services firm that speaks the owner's language, so your schedule becomes the reason the project moves forward, not the reason it stalls.

    Send your specs today. Flat-fee quote within 24 hours.

    or call (833) 777-6276