CPM scheduling services in South Carolina for Lowcountry, Midlands and Upstate contractors
Baseline schedules, monthly updates and time impact analysis in Primavera P6 or MS Project for Fort Jackson, Joint Base Charleston, Parris Island, SCDOT and private work. One flat fee, with revisions until the schedule is approved.
✓ Flat-fee quote within 24 hours
✓ PSP®-certified schedulers
✓ Unlimited revisions until approved
Prefer to talk first? Call (833) 777-6276
Builders who rely on Leopard for federal, hotel and institutional schedules






What a returned schedule costs between Charleston and Greenville
The USACE Charleston District reviews Army and Air Force work at Fort Jackson and Joint Base Charleston. NAVFAC Mid-Atlantic reviews Marine Corps work at Beaufort and Parris Island. SCDOT and private owners write their own schedule clauses. When a schedule misses the clause, you pay for it like this:
The baseline comes back marked “revise and resubmit.”
Payment waits while the update is corrected.
A named storm takes a week and the schedule can’t show it.
Pile and foundation work that runs long with no float behind it
An owner’s rep who starts checking every date you give
Most of that traces back to a baseline that was not built to the contract’s scheduling clause.
Get My Flat-Fee QuoteOur method for South Carolina federal, SCDOT and private schedules
Every schedule we build starts with one question: what does your contract say about scheduling? For Charleston District work that is UFGS 01 32 01.00 10. For Beaufort and Parris Island it is the NAVFAC section, UFGS 01 32 17.00 20. For SCDOT and private jobs it is the owner’s own clause.
Planning the baseline: we sequence sitework, foundations, structure and finishes with your team, add weather calendars for the coast, and code the activities the way the clause requires. Keeping it current: each month we log actual progress and send the updated schedule with its narrative within 1–2 working days of your data.
Protecting your time: if a storm, an unforeseen soil condition or an owner change costs you days, we document it in a time impact analysis you can submit with the request.
Get My Flat-Fee QuoteSchedule services for South Carolina general contractors
Baseline CPM schedules written to Charleston District, NAVFAC or SCDOT requirements.
Monthly schedule updates every month, narrative included.
Time impact analysis after storms, soil surprises and owner changes.
Independent schedule reviews so comments get fixed before the agency sees them.
Recovery schedules that show how you get the date back.
Cost and resource loading for schedule-of-values billing.
Bid-stage schedules for South Carolina hotel, campus and federal pursuits.
Get My Flat-Fee QuoteYour South Carolina schedule in three moves
Step 01
Send your specs
Share the spec section, a drawing list and the completion date in your contract. No documents yet? Walk us through the project by phone.
Step 02
Get a flat-fee quote in 24 hours
We send a fixed, written fee within 24 hours that names every deliverable. Draft baselines typically arrive within 7 days.
Step 03
Get an approved schedule
You go through the draft with us, we check it against the clause, and we revise without limit until the owner or agency approves.
Proof from Charleston and the Florida coast
Residence Inn, Ormond Beach, FL
Kellogg & Kimsey
We updated this hotel’s Primavera P6 schedule for 25 consecutive months. When completion slipped, our time impact analysis supported a 59-day extension of the TCO date, and it was granted.
Cathedral Hall addition, Charleston, SC
Hightower Construction
New two-story addition at Grace Church Cathedral, built on helical piles beside occupied church buildings. We built the Primavera P6 baseline and have delivered six monthly updates with narratives since January 2026. As of the September 2026 update, the schedule forecasts completion on the contract date.
What a project executive wrote after schedule update #7
“Leopard Project Controls has been a welcomed breath of fresh air, extremely well-versed, talented, and detail-oriented. Their work product for our Progress Schedule Update #7 was truly impressive, especially in light of major design revisions, critical structural RFIs, and weather delays. Thanks to their support and our on-site team’s leadership, we’re trending ahead of schedule and back on track for substantial completion.”
Ernest G. Floerke, Jr., Project Executive
Kellogg & Kimsey, Inc.
Recent project experience near South Carolina
Our St. Augustine, Florida office is a few hours down the coast from Charleston. Below are recent federal projects from the same region.
Womack Army Medical Center Generator Switchgear
Fort Bragg, NC
Laurel Falls Project
Great Smoky Mountains National Park, TN
Client: Pavkov Contracting
Malcolm Randall VA Medical Center Stairwells
Gainesville, FL
Keeping the schedule in the trailer vs. giving it to a scheduler
Run from the job trailer
Logic gets drawn when there is time.
Coding is fixed after the first rejection.
Month-end updates slip past the cutoff.
The narrative repeats last month’s.
Storm days go unrecorded.
Pay requests wait on corrections.
Run by Leopard
A draft baseline, typically within 7 days.
Activity coding done to the clause up front.
Each update back within 1–2 working days.
A fresh narrative every month.
Weather and delay events logged as they occur.
As many revisions as approval takes.
Get a scheduler on your job without adding a hire.
Get My Flat-Fee QuoteSouth Carolina construction scheduling consultants for federal, SCDOT and commercial work
Federal construction in South Carolina runs through more than one office. The USACE Charleston District manages military construction at Fort Jackson and supports Joint Base Charleston, and its contracts usually carry UFGS 01 32 01. Marine Corps projects at MCAS Beaufort and Parris Island go through NAVFAC Mid-Atlantic, which uses UFGS 01 32 17.00 20. The specs differ on coding, reports and update rules, so we build the schedule for the reviewer who will read it.
Leopard’s CPM scheduling services in South Carolina start before the first submittal. Send the spec and your plan for the work, and we build the baseline schedule in Primavera P6 or Microsoft Project with the WBS, logic and calendars the contract calls for. Draft baselines typically arrive within 7 days, with unlimited revisions until approved.
SCDOT road and bridge contracts bring their own CPM requirements, and private owners want updates they can read. In Charleston, we built the Primavera P6 baseline for Hightower Construction’s Cathedral Hall addition at Grace Church Cathedral and have delivered six monthly updates. In Asheville, North Carolina, our time impact analysis for Kellogg & Kimsey’s Moxy hotel tied 64 calendar days of delay to three specific changes. Every South Carolina job gets the same monthly schedule updates, returned with a narrative within 1–2 working days of your progress data.
When a delay starts to drive the finish date, we prepare a time impact analysis while the records are fresh. As your South Carolina construction scheduling consultant, our CPM scheduling firm works remotely from St. Augustine, Florida, and every job is quoted as a flat fee. See our full CPM scheduling services, or Get My Flat-Fee Quote.
What South Carolina builders ask us
Yes. We schedule South Carolina projects remotely from St. Augustine, Florida, with calls and screen-shares with your team, and we travel to site when the job needs it.
Yes. We build to the spec in your contract: UFGS 01 32 01 on USACE Charleston District work at Fort Jackson and Joint Base Charleston, and UFGS 01 32 17.00 20 on NAVFAC Mid-Atlantic work at MCAS Beaufort and Parris Island.
Quotes go out within 24 hours as a flat fee. Draft baselines typically arrive within 7 days. For monthly updates, you send progress data and we return the update and narrative within 1–2 working days.
Yes. Each quote is one flat fee per update, or one flat monthly fee for the whole project, and it lists what you get. The cost factors are explained on our CPM scheduling cost page.
Yes. We build CPM schedules to your SCDOT contract’s requirements and for private owners who require a CPM schedule, in Primavera P6 or Microsoft Project, with monthly updates through closeout.
Yes. We sign an NDA on request and keep to its terms. Client and project names appear on our website only with permission.
Tell us about your South Carolina job. We price it within 24 hours.
A Fort Jackson barracks, a Parris Island facility, an SCDOT widening or a Charleston hotel: one spec, one flat fee, one team that stays through closeout.
Address: 2820 US Highway 1 S, Suite H, Saint Augustine, FL 32086
Email: info@consultleopard.com
Phone: (833) 777-6276
Website: www.consultleopard.com