Construction schedule review before you submit to the owner

An independent CPM schedule review of your Primavera P6 or MS Project baseline or update, checked against your contract’s scheduling spec. You get written comments your team can close before the submittal goes out.

✓ Flat-fee quote within 24 hours

✓ PSP®-certified schedulers

✓ Logic, float and spec-compliance checks

Prefer to talk first? Call (833) 777-6276

Get a flat-fee quote in 24 hours

Send your schedule file and the spec section and get a flat-fee quote within 24 hours. NDA on request.

    Schedule reviews for general contractors on federal, public and commercial work

    Royce Construction Services logoKellogg and Kimsey logoChugach Government Solutions logoHunt Builders Corporation logoCrossland Construction logoTowson Mechanical logo

    A rejected schedule costs you a review cycle and holds up payment

    Your team built the schedule. The logic is in and the dates line up. Then the owner’s reviewer opens the file and sends it back. The comments are usually about the same things:

    • Open-ended activities, missing predecessors and constraints that hide the real float.
    • A longest path that runs through the wrong work, such as procurement of items that are not long-lead.
    • Calendars, activity codes and durations that do not follow the scheduling section of the contract.
    • Cost loading that does not tie to the schedule of values.
    • A narrative that does not explain the critical path or the changes since the last submission.

    Each rejection means a resubmittal, and on many contracts the pay application waits until the schedule is accepted. Want a quick first look at your file? Start with the free DCMA 14-point schedule check.

    Get My Flat-Fee Quote

    Flat-fee quote in 24 hours · NDA on request

    A second set of eyes from schedulers who face the same reviewers

    Leopard Project Controls builds and updates CPM schedules for general contractors, and those schedules go through USACE, NAVFAC, VA and public owner reviews. We know which comments come back because we answer them on our own submittals.

    We also work on the reviewer’s side. On the Fort Randall Major Unit Rehabilitation, we review the contractor’s monthly Primavera P6 updates for the USACE project team: forecast movement, the driving path, float, cost-loaded progress and schedule quality. We read your file the same way.

    Our PSP®-certified schedulers review your Primavera P6 or Microsoft Project file the way the owner’s reviewer will: against the scheduling section in your contract, such as UFGS 01 32 01.00 10 on USACE work, UFGS 01 32 17.00 20 on NAVFAC work or VA section 01 32 16.15. You keep the schedule. We tell you what to fix before you submit, and we make the corrections if you ask us to.

    How the schedule review works

    1. Send your schedule and spec. The XER or MPP file, the scheduling spec section and any review comments you have already received.
    2. Get a flat-fee quote in 24 hours. Scope, deliverables and the delivery date in writing.
    3. Submit a schedule that is ready for review. You get written comments by activity, ranked by what a reviewer is most likely to reject, and a call to walk through them if you want one.
    Get My Flat-Fee Quote

    Flat-fee quote in 24 hours · NDA on request

    Schedules we have taken through agency and owner review

    We know what reviewers flag because our own schedules go through the same reviews, and because we review contractor schedules for the Government.

    USACE · Owner-side review

    Fort Randall Major Unit Rehabilitation

    Fort Randall Dam, SD
    For: the USACE Government project team
    Scheduling consultant to the Government: monthly written reviews of the contractor’s Primavera P6 schedule updates, about 7,400 activities across eight generating units

    USACE

    USMA Public Health Clinic

    West Point, NY
    Client: Royce Construction Services
    Rejected P6 schedule corrected to the contract spec; time extension approved

    Veterans Affairs

    Surgical HVAC Systems Replacement, Lovell Federal Health Care Center

    North Chicago, IL
    Client: Blue Yonder Inc.
    Microsoft Project baseline, approved by the VA contracting officer’s representative

    Niagara County

    Niagara County New Public Works Facility

    Lockport, NY
    Client: Walter S. Johnson Building Co.
    Primavera P6 baseline, owner review comments answered, 7 progress updates

    Metropolitan Council

    Gold Line BRT, Woodlane Drive Station Park & Ride

    Woodbury, MN
    Client: Donlar Construction
    Cost-loaded P6 baseline, approved by the owner’s representative

    “Leopard’s updates helped us pass NAVFAC review on the first try. It saved our cash flow and gave our client confidence.”
    Neal Jellison, Project Manager, Chugach Government Solutions

    What the review covers

    • Critical path and longest path: whether the path runs through the work that controls the job.
    • Logic health: open ends, missing or redundant ties, lags, leads and hard constraints.
    • Calendars and coding: work weeks, weather days, activity codes and settings the spec asks for.
    • Spec conformance: maximum durations, required milestones, Government review periods and cost or resource loading.
    • Sequencing: whether the trades can build the job in the order shown.
    • Narrative and fragnets: whether the write-up matches the file.
    • Written report: comments by activity with the fix for each, and an optional call with the reviewing scheduler.

    Issues we find most often

    • Finishes sequenced before inspections, or overlapping rough-ins.
    • Missing steps on the way to the certificate of occupancy.
    • Trade stacking where crews share one area.
    • Missing milestones such as watertight, permanent power and equipment start-up.
    • Owner-furnished, contractor-installed items with no activities or ties.
    • Cost and resource loading that does not follow the phasing.
    Get My Flat-Fee Quote

    Flat-fee quote in 24 hours · NDA on request

    CPM schedule review consultants for baseline and update submittals

    A construction schedule review is an independent check of your CPM schedule before the owner sees it. A scheduler who did not build the file reads it against the contract: the logic, the longest path, the calendars, the coding, the loading and the narrative. The result is a list of comments your team can close before the submittal goes out.

    Contractors bring in a CPM schedule review consultant at three points. The first is before the baseline submittal, when the schedule sets the dates the owner will hold you to. The second is before a monthly update, when progress, logic changes and the narrative have to agree. The third is after a rejection, when the reviewer’s comments need answers and the pay application is waiting. If you need the update itself done each period, see our monthly schedule update services.

    Our schedule review services cover Primavera P6 and Microsoft Project files. On federal work we check the file against the section your contract cites. State DOTs, transit agencies and private owners write their own requirements, and we review against those. For a first screen, the DCMA 14-point assessment tests the file against 14 technical metrics at no charge.

    An independent schedule review also protects you later. A baseline with clean logic and realistic durations is the starting point for every update and for any time impact analysis you may need when the job changes. Send your schedule and the spec section, and you get a flat-fee quote in 24 hours.

    Schedule review FAQ

    Do you take over our schedule or only review it?

    We review it and you keep it. You get written comments and the fix for each one. If you want us to make the corrections in your Primavera P6 or Microsoft Project file, we can quote that too.

    How is this different from the free DCMA 14-point check?

    The free check tests your XER or MPP against the DCMA 14-point metrics and comes with a written narrative and recommendations. A full schedule review also reads your contract’s scheduling section, the sequencing, the loading and the schedule narrative.

    How fast can we get the review back?

    You get a flat-fee quote within 24 hours of sending the file and the spec section. The quote states the delivery date, set ahead of your submittal date.

    What does a schedule review cost?

    One flat fee per review, quoted in writing within 24 hours. The fee depends on the size of the schedule and the requirements in the spec.

    Which software and specs do you review against?

    Primavera P6 and Microsoft Project files. We review against the scheduling section in your contract, including UFGS 01 32 01.00 10 for USACE, UFGS 01 32 17.00 20 for NAVFAC and the VA 01 32 16 sections.

    Will you sign an NDA?

    Yes. We sign an NDA on request.

    Send your schedule and get your quote in 24 hours

    Attach the XER or MPP file and the scheduling spec section, and tell us your submittal date. NDA on request.

      Call (833) 777-6276Get My Quote