CPM scheduling services in Georgia for federal, GDOT and data center contractors
Primavera P6 and MS Project baselines, monthly updates and time impact analyses for USACE Savannah District, NAVFAC Southeast, GDOT and metro Atlanta data center work. Built to your contract spec and revised until approved.
✓ Flat-fee quote within 24 hours
✓ Schedulers who know USACE, NAVFAC & VA specs
✓ Unlimited revisions until approved
Prefer to talk first? Call (833) 777-6276
General contractors who use Leopard schedules on federal and data center work





When Savannah District or GDOT sends your schedule back
Savannah District and NAVFAC Southeast reviewers check your baseline against the UFGS schedule spec. GDOT and Atlanta data center owners hold you to their milestone dates the same way. A late or rejected schedule costs you in five ways:
A baseline returned for open-ended logic or missing activity codes.
A pay application held until the monthly update is accepted.
Storm delays on earthwork that you can’t prove without a weather calendar.
Utility power and switchgear dates that slip with no warning
A contracting officer who stops believing your finish date
A baseline built to the schedule section of your Georgia contract avoids most of these.
Get My Flat-Fee QuoteHow we build schedules for Georgia federal, GDOT and data center work
We read the schedule section of your contract first: UFGS 01 32 01.00 10 on Savannah District work, UFGS 01 32 17.00 20 on NAVFAC Southeast work, or the owner’s milestone list on a data center.
Baselines: WBS, logic, activity codes and weather calendars set up the way that spec asks, in Primavera P6 or Microsoft Project. Updates: we confirm progress with your superintendent and return the update and narrative within 1–2 working days of your progress data.
Delays: when a design change, a late owner decision or a utility date moves your finish, we prepare the time impact analysis while the records are fresh.
Get My Flat-Fee QuoteScheduling work Georgia contractors send us
Baseline CPM schedules for Savannah District, NAVFAC Southeast, VA and GDOT submittals.
Monthly schedule updates with the narrative your contracting officer reads.
Time impact analysis for weather, changes and late owner decisions.
Independent schedule reviews before you submit to the district.
Recovery schedules when a data center milestone slips.
Cost loading tied to your schedule of values for pay estimates.
Bid schedules for Georgia proposals and pre-award submittals.
Get My Flat-Fee QuoteThree steps from your Georgia spec to an approved schedule
Step 01
Send your specs
Send the schedule section of your contract, the drawings list and your milestone dates. If the district already returned a baseline, send the comments too.
Step 02
Get a flat-fee quote in 24 hours
Within 24 hours you have a fixed price in writing, with each deliverable listed. Draft baselines typically arrive within 7 days.
Step 03
Get an approved schedule
We build the schedule to your spec and revise it as many times as it takes until Savannah District, NAVFAC, GDOT or your owner approves it.
Results from Albany, Georgia and a live data center program
DartPoints CVG data center expansion, Cincinnati, OH
Hunt Builders
We built the Level 3 and Level 5 Primavera P6 baseline program from scratch and cost-loaded it to the schedule of values. We update it weekly and send the owner a monthly MS Project update that matches P6.
Fire alarm repairs, MCLB Albany, GA
Milton J. Wood Fire Protection
NAVFAC fire alarm repairs across more than a dozen buildings, with a project budget of about $11.4 million. Since the January 2024 notice to proceed, we have provided project controls and CPM scheduling: a cost-loaded schedule and 26 monthly progress updates. At the August 2026 update, the projected finish matched the contract completion date.
A NAVFAC contractor on our schedule updates
“Leopard’s updates helped us pass NAVFAC review on the first try. It saved our cash flow and gave our client confidence.”
Neal Jellison, Project Manager
Chugach Government Solutions
Recent project experience in and near Georgia
Georgia is the next state north of our St. Augustine, Florida office. These are recent federal and state projects we scheduled in Georgia and across the Southeast.
South Section Avionics Complex, Building 645
Robins Air Force Base, GA
Client: Brawley, Inc.
Laurel Falls Project
Great Smoky Mountains National Park, TN
Client: Pavkov Contracting
Womack Army Medical Center Generator Switchgear
Fort Bragg, NC
Client: Royce Construction Services
Malcolm Randall VA Medical Center Stairwells
Gainesville, FL
Client: V-Line Services
Operation Readiness Training Complex
Camp Blanding Joint Training Center, Starke, FL
Client: Elkins Construction
Emergency Operations Center
Florida Division of Emergency Management
Client: Perry-McCall Construction
Building the Georgia schedule in-house vs. handing it to Leopard
Built by your PM between other duties
Baseline started after notice to proceed.
UFGS requirements found in the review comments.
Updates rushed the week the pay app is due.
Narratives that skip the logic changes.
Storm and change delays argued by email.
Resubmittals that hold your payment.
Built by Leopard
Draft baseline typically within 7 days.
UFGS coding and calendars set from day one.
Update and narrative back in 1–2 working days.
Narratives that explain every logic change.
Delay analysis started while records are fresh.
Unlimited revisions until approved.
Get a schedule your contracting officer can approve.
Get My Flat-Fee QuoteGeorgia construction scheduling consultants for federal, state and data center work
Federal work is a large part of Georgia construction, and the reviewer depends on the base. The USACE Savannah District runs military construction at Fort Stewart, Hunter Army Airfield, Fort Benning, Fort Gordon, Robins Air Force Base and Moody Air Force Base, so those schedules usually follow UFGS 01 32 01: a Primavera P6 baseline with activity codes, a narrative and monthly updates in native .xer. Navy and Marine Corps projects at Naval Submarine Base Kings Bay and Marine Corps Logistics Base Albany go through NAVFAC Southeast, which uses UFGS 01 32 17.00 20. We know that review first hand: since 2024 we have provided project controls and CPM scheduling to Milton J. Wood Fire Protection on the fire alarm repairs project at MCLB Albany.
Our CPM scheduling services in Georgia begin with the schedule section of your contract. We read what the reviewer will check, then build the WBS, logic, calendars and activity codes to match, in Primavera P6 or Microsoft Project. Draft baselines typically arrive within 7 days. If your baseline has already been returned with comments, an independent schedule review shows you what to fix before you resubmit.
State and private owners ask for the same discipline. GDOT road and bridge contracts carry their own CPM requirements, and the data center campuses around metro Atlanta run on owner milestones for power, commissioning and turnover. For Hunt Builders, our team built the Level 3 and Level 5 P6 baseline program for the DartPoints CVG data center expansion from scratch and updates it weekly. We bring the same method to data center scheduling in Georgia.
Once the baseline is approved, we keep it current with monthly schedule updates, returned with a narrative within 1–2 working days of your progress data. When a delay starts to move the finish date, we prepare a time impact analysis while the records are fresh. As your Georgia construction scheduling consultant, our CPM scheduling firm works remotely from St. Augustine, Florida, and quotes every job as a flat fee. See our full CPM scheduling services, or Get My Flat-Fee Quote.
Questions Georgia contractors ask before they hire us
Our office is in St. Augustine, Florida, about an hour’s drive from the Georgia line. We run schedule meetings by call and screen-share with your project team, and we travel to site when the job needs it.
Yes. We build to the spec in your contract: UFGS 01 32 01 on USACE Savannah District work at Fort Stewart, Fort Benning, Fort Gordon and Robins AFB, and UFGS 01 32 17.00 20 on NAVFAC Southeast work at Kings Bay and MCLB Albany.
You get a flat-fee quote within 24 hours. Draft baselines typically arrive within 7 days. After that, each monthly update comes back with its narrative within 1–2 working days of receiving your progress data.
We quote one flat fee per update, or one flat monthly fee for the whole project. Every deliverable is listed in the quote. See what drives the price on our CPM scheduling cost page.
Yes. Data center schedules need power, commissioning and turnover milestones in the logic. For Hunt Builders, our team built the Level 3 and Level 5 P6 baseline program for the DartPoints CVG data center expansion and updates it weekly. See our data center scheduling services.
Yes. NDA on request. We keep every confidentiality term we sign, and we never name a client or project on our website without permission.
Your next step
Send your Georgia spec. Get your flat-fee number within 24 hours.
Fort Stewart, Kings Bay, a GDOT bridge or a data center campus: tell us the job and the spec, and we price it as one flat fee.
- Send your spec and filesThe scheduling spec section, contract dates and any XER or MPP file you already have.
- Get a flat-fee quote in 24 hoursOne fixed price, the deliverables and the delivery date in writing.
- Revise until approvedWe build it to the spec and make unlimited revisions until it is approved.
Why contractors call us
- Primavera P6 and MS Project schedules built to USACE, NAVFAC, VA and DOT specs
- Draft baselines typically within 7 days
- Monthly update and narrative within 1–2 working days of your progress data
- One flat fee per update, or one flat monthly fee for the whole project
- NDA on request
Not sure your current schedule will pass? Get a free DCMA 14-point schedule check. Prefer email? info@consultleopard.com