Concepts of Building Information Modeling (BIM) and Primavera P6
September 16, 2020
This article highlights Building Information Modeling (BIM) concepts, particularly about 4D scheduling and using Navisworks to integrate the Primavera P6 schedule with smart 3D models. When addressed separately, Primavera P6 is the tool used for integrated scheduling and resource planning, while Navisworks is a 4D simulation that is used to bring the project plan into a sort of virtual