CPM scheduling services in Florida for public, military and hotel builders

Primavera P6 and MS Project baselines, monthly updates, as-built schedules and time impact analysis from our St. Augustine office, for state, federal and private owners across Florida.

✓ Flat-fee quote within 24 hours

✓ Schedulers who know USACE, NAVFAC & VA specs

✓ Unlimited revisions until approved

Prefer to talk first? Call (833) 777-6276

Get a flat-fee quote in 24 hours

Send the scheduling spec for your Florida project and the drawing list. A flat-fee quote comes back within 24 hours. NDA on request.

    or email your files to info@consultleopard.com

    Florida and national contractors who put Leopard on the schedule

    Royce Construction Services logoHunt Builders Corporation logoKellogg and Kimsey logoChugach Government Solutions logoDonlar Construction logoCrossland Construction logo

    What costs Florida contractors time: long-lead gear, storm season and a schedule that hides both

    Florida jobs rarely slip because of one bad week. They slip when switchgear arrives months late, when a storm shuts the site at the wrong moment, or when a certificate of occupancy date moves and nobody can show why. If the schedule does not record those events as they happen, you are left with:

    A delay you cannot tie to the gear, the storm or the design change behind it.

    An owner who rejects the update because the logic no longer matches the field.

    A hotel opening date missed with no supported extension request.

    A state or federal pay application waiting on an accepted schedule.

    Closeout with no as-built schedule to settle the time account.

    A schedule that is updated every month and records each delay as a fragnet keeps the time account straight from mobilization to closeout.

    Get My Flat-Fee Quote

    How we run schedules on Florida public, military and hotel work

    We work from St. Augustine and can come to site when the job needs it. The baseline follows the contract: the state’s requirements on a public building, the federal spec on a base or a VA medical center, and the opening date on a hotel.

    Baselines and updates: a Primavera P6 or Microsoft Project baseline built with your superintendent, then a monthly update and narrative returned within 1–2 working days of your progress data. Long-lead items: submittal, approval and delivery of electrical gear, elevators and generators are scheduled as their own activities, so a late delivery shows in the forecast as soon as it starts to slip.

    Delays and closeout: each delay gets a fragnet and, where the contract allows time, a time impact analysis. At the end of the job we can deliver the as-built schedule that records what happened and when.

    Get My Flat-Fee Quote

    Scheduling services for Florida general contractors

    Baseline CPM schedules for state, county, federal and private Florida projects.

    Monthly schedule updates with a narrative, every month through closeout.

    Time impact analysis for long-lead equipment, design changes and storm delays.

    Independent schedule reviews before you submit to the owner or the agency.

    Recovery schedules when an opening or turnover date is at risk.

    As-built schedules that close out the time record at the end of the job.

    Bid and GMP-stage schedules for Florida pursuits.

    Get My Flat-Fee Quote

    From Florida contract to approved schedule in three steps

    Step 01

    Send your specs

    Send the contract’s scheduling requirements, the drawings and the dates that matter: turnover, opening or substantial completion.

    Step 02

    Get a flat-fee quote in 24 hours

    Your flat fee arrives in writing within 24 hours and lists each deliverable. Draft baselines typically arrive within 7 days.

    Step 03

    Get an approved schedule

    We answer the owner’s review comments with you and revise the schedule, with unlimited revisions, until it is approved.

    Florida results: a state emergency operations center and an Ormond Beach hotel

    Emergency Operations Center, State of Florida Division of Emergency Management

    Perry-McCall Construction

    We supported the schedule through 23 updates and the as-built schedule. An electrical gear delay was tracked as a fragnet from design revision to delivery, temporary power kept the work moving, and the project reached final completion 56 days ahead of the baseline date.

    Residence Inn, Ormond Beach, FL

    Kellogg & Kimsey

    We delivered 26 monthly Primavera P6 updates. When the certificate of occupancy date came under pressure, our time impact analysis supported a 59-day extension of the TCO date, which was granted.

    What Kellogg & Kimsey’s project executive said

    “Leopard Project Controls has been a welcomed breath of fresh air, extremely well-versed, talented, and detail-oriented. Their work product for our Progress Schedule Update #7 was truly impressive, especially in light of major design revisions, critical structural RFIs, and weather delays. Thanks to their support and our on-site team’s leadership, we’re trending ahead of schedule and back on track for substantial completion.”

    Kellogg and Kimsey logo

    Ernest G. Floerke, Jr., Project Executive

    Kellogg & Kimsey, Inc.

    Florida project experience

    Our office is in St. Augustine. This is recent work across the state, from Pensacola to Fort Lauderdale.

    State of Florida

    Emergency Operations Center

    Florida Division of Emergency Management
    Client: Perry-McCall Construction

    Florida Army National Guard

    Operation Readiness Training Complex

    Camp Blanding Joint Training Center, Starke, FL
    Client: Elkins Construction

    NAVFAC

    Replace Fire Alarm Systems

    Pensacola, FL
    Client: Milton J. Wood Fire Protection

    Veterans Affairs

    Malcolm Randall VA Medical Center Stairwells

    Gainesville, FL
    Client: V-Line Services

    Hospitality

    Residence Inn

    Ormond Beach, FL
    Client: Kellogg & Kimsey

    Broward County Aviation

    Terminal 3 Generator Replacement

    Fort Lauderdale-Hollywood International Airport, FL
    Client: Eau Gallie Electric

    Veterans Affairs

    Emergency Generators and Paralleling Gear, West Palm Beach VA Medical Center

    West Palm Beach, FL
    Client: Eau Gallie Electric

    NAVFAC

    Fire Safety System Upgrades, NSA Orlando

    Orlando, FL
    Client: Milton J. Wood Fire Protection

    A Florida schedule that falls apart vs. one that holds through closeout

    Falls apart

    Long-lead equipment shown as one line with no dates.

    No weather allowance in the calendars.

    Out-of-sequence progress left uncorrected.

    Delays noted in emails, never in the schedule.

    Updates skipped in the busy months.

    No as-built record at closeout.

    Built by Leopard to hold

    Baseline draft, typically within 7 days.

    Submittal, approval and delivery tracked for long-lead gear.

    Update and narrative within 1–2 working days.

    A fragnet for every delay event.

    Time impact analysis where the contract allows time.

    Unlimited revisions until approved.

    Keep the time account straight from day one.

    Get My Flat-Fee Quote

    Florida construction scheduling consultants for public, federal and hospitality projects

    Leopard Project Controls works from St. Augustine, and Florida is where much of our project record sits. Our CPM scheduling services in Florida cover state and county buildings, military and VA facilities, and hotels, in Primavera P6 or Microsoft Project.

    For Perry-McCall Construction we supported the Emergency Operations Center for the State of Florida Division of Emergency Management through 23 schedule updates and the as-built schedule. An electrical gear delay ran from design revision through delivery. It was recorded as a fragnet, temporary power kept the work going, and the project reached final completion 56 days ahead of the baseline date. For Kellogg & Kimsey, 26 monthly updates on the Residence Inn in Ormond Beach ended with a time impact analysis that supported a 59-day extension of the TCO date.

    Our Florida federal and military work includes the Operation Readiness Training Complex at Camp Blanding Joint Training Center, with 18 schedule updates through substantial completion, fire alarm replacement work in Pensacola under NAVFAC on a cost-loaded schedule we update monthly, and stairwell renovations at the Malcolm Randall VA Medical Center in Gainesville. As a construction scheduling company, we build to UFGS 01 32 17.00 20 on Navy work and to the VA’s network analysis schedule sections on VA medical centers.

    FDOT, county and school district contracts each carry their own schedule requirements, and private owners need an opening date they can plan around. After the baseline is approved we keep it current with monthly schedule updates. As your Florida construction scheduling consultant, our CPM scheduling firm quotes every job as a flat fee. Read more about our CPM scheduling services, or Get My Flat-Fee Quote.

    What Florida contractors ask before sending a spec

    In St. Augustine, Florida. It is our only office. We work with contractors across the state by call and screen-share, and we come to site when the job needs it.

    Yes. Recent work includes the Emergency Operations Center for the State of Florida Division of Emergency Management, the Operation Readiness Training Complex at Camp Blanding Joint Training Center, fire alarm replacement in Pensacola under NAVFAC and stairwell renovations at the Malcolm Randall VA Medical Center in Gainesville.

    It can show what the delay did. We add the delay as a fragnet, from design revision or approval through delivery, and prepare a time impact analysis where the contract allows a time request. On the Emergency Operations Center, the electrical gear delay was tracked that way through the as-built schedule.

    With weather allowances in the project calendars, as the contract provides. When a named storm shuts the site, the lost days are recorded in the next update and, if the contract allows time for it, supported with a time impact analysis.

    The flat-fee quote takes 24 hours or less, and draft baselines typically arrive within 7 days. Monthly updates and narratives come back within 1–2 working days of your progress data. You pay one flat fee per update, or one flat monthly fee for the whole project. See our CPM scheduling cost page.

    Yes. The as-built schedule compares actual dates with the baseline, lists added and deleted activities and explains each delay. We delivered one for the Emergency Operations Center at the end of the project.

    Your next step

    Florida schedule due? Get the flat-fee quote from St. Augustine.

    A state building, a base project or a hotel on the coast: send the requirements and we reply within 24 hours with one flat fee.

    1. Send your spec and filesThe scheduling spec section, contract dates and any XER or MPP file you already have.
    2. Get a flat-fee quote in 24 hoursOne fixed price, the deliverables and the delivery date in writing.
    3. Revise until approvedWe build it to the spec and make unlimited revisions until it is approved.

    Why contractors call us

    • Primavera P6 and MS Project schedules built to USACE, NAVFAC, VA and DOT specs
    • Draft baselines typically within 7 days
    • Monthly update and narrative within 1–2 working days of your progress data
    • One flat fee per update, or one flat monthly fee for the whole project
    • NDA on request

    Not sure your current schedule will pass? Get a free DCMA 14-point schedule check. Prefer email? info@consultleopard.com

    Send your Florida schedule requirements

    Upload the scheduling spec and your key dates. You get a flat-fee quote within 24 hours. NDA on request.

      Call (833) 777-6276Get My Quote