USACE scheduling consultant for UFGS 01 32 01.00 10 schedules
A schedule that misses UFGS 01 32 01.00 10 can hold up your pay requests. We build the Primavera P6 preliminary and initial schedules, run the monthly updates and prepare time impact analyses, for prime contractors on Army Corps of Engineers design-bid-build and design-build work.
✓ Flat-fee quote within 24 hours
✓ Schedulers who know USACE, NAVFAC & VA specs
✓ Unlimited revisions until approved
Prefer to talk first? Call (833) 777-6276
USACE and federal contractors who put Leopard on the schedule





Approvedtime extension, and Pay App #14 certified
Recent USACE result
USMA Public Health Clinic, West Point, NY
A rejected Primavera P6 schedule, fixed to the contract spec, then time impact analyses for the delays. The time extension was approved and Pay App #14 was certified.
Client: Royce Construction Services
Why USACE schedules come back
A schedule that misses the spec can hold up your pay requests
Under UFGS 01 32 01.00 10, a schedule that does not comply can be disapproved, and payment requests can be rejected until it does. If the revisions the Contracting Officer asks for are not made, 10 percent of each pay request can be withheld. Schedules come back for reasons like these:
Non-procurement activities longer than 20 workdays or 30 calendar days.
Leads (negative lags) or start-to-finish relationships, which the spec does not allow.
Front-end loaded activity costs, or costs placed on submittal preparation and review.
Actual start and finish dates that do not match the daily quality control reports.
More open ends than the two the spec allows, or an SDEF export that breaks its required structure.
Long-lead procurement over 90 calendar days left out of the logic.
Each round of comments costs weeks your team planned to spend building.
Get My Flat-Fee QuoteWhy Leopard
USACE schedules from schedulers who know the review from both sides
We build USACE schedules from the contractor’s side, from the preliminary schedule due 15 calendar days after notice to proceed through the monthly updates and time impact analyses. On the Fort Randall Major Unit Rehabilitation, we also review the contractor’s monthly Primavera P6 updates for the USACE project team, so we know what the Government reviewer checks.
Spec we build to: UFGS 01 32 01.00 10, Project Schedule, in Primavera P6, on design-bid-build and design-build contracts. Our schedulers bring more than 20 years of CPM scheduling experience.
Our scheduler can serve as the Project Scheduler the spec asks for, with the previous Primavera P6 schedules section 1.3 calls for. No new hire on your side.
Turnaround: draft baselines typically arrive within 7 days, and we revise the schedule, without limit, until it is approved.
Get My Flat-Fee QuoteWhat your USACE scheduling package includes
Project Scheduler: an experienced Primavera P6 scheduler with the previous schedules for your section 1.3 qualification submittal.
Preliminary and initial schedules: the first 90 days of work, then the full project schedule, planned around the spec’s 15-day and 42-day deadlines.
Spec checks: 20-workday activities, no leads or start-to-finish links, long-lead procurement, and actual dates that match the daily quality control reports.
Cost loading: activity costs spread without front-end loading, with the earnings report by CLIN.
Monthly updates: narrative, longest path and SDEF files within 1–2 working days of your progress data.
Time impact analysis: prospective TIAs to AACE 52R-06 when a modification or a delay moves the finish.
Review support: answers to the Government’s comments, with unlimited revisions until approved.
Built a bid schedule with us? Win the job and keep us on for updates, and you pay no baseline fee. See bid schedule development.
Get My Flat-Fee QuoteFrom notice to proceed to an approved USACE schedule
Step 01
Send Your Specs
Section 01 32 01.00 10 from your contract, the drawings or drawing index, the schedule of values and your contract dates.
Step 02
Flat-Fee Quote in 24 Hours
Scope, deliverables and the delivery date in writing. Draft baselines typically arrive within 7 days.
Step 03
Approved Schedule
We answer the Government’s comments with you and revise the schedule, without limit, until it is approved.
USACE schedules on recent projects
Womack Army Medical Center generator switchgear (design-build), Fort Bragg
Client: Royce Construction Services
Fort Bragg, NC
Primavera P6 baseline and 26 monthly updates, cost-loaded and tied to RMS/SDEF pay estimates, for the USACE Little Rock District
Design-Build Replace Eight AHUs, Wright-Patterson AFB
Client: Royce Construction Services
Wright-Patterson AFB, OH
Design-build baseline schedule, cost-loaded to the schedule of values, for the USACE Little Rock District
USMA Public Health Clinic, West Point
Client: Royce Construction Services
West Point, NY
Rejected P6 schedule fixed to the contract spec, then time impact analyses for the delays
Fort Randall Major Unit Rehabilitation
For: the USACE Government project team
Fort Randall Dam, SD
Scheduling consultant to the Government: monthly written reviews of the contractor’s Primavera P6 schedule updates, about 7,400 activities across eight generating units
What our clients say
“Our schedule was approved with no penalties, and payments continued.”
Jason Ruppert, Vice President
Royce Construction Services
USACE CPM scheduling services for prime contractors
Leopard is a USACE scheduling consultant for prime contractors who build under UFGS 01 32 01.00 10, Project Schedule. The spec does not ask you to hire a consultant. It asks for a Project Scheduler with at least three previous construction schedules in Primavera P6 on projects of similar size and complexity, and it makes those qualifications a submittal the Government approves. As a scheduling firm, we fill that role or back up the scheduler you already have.
Our Army Corps of Engineers scheduling work covers preliminary and initial schedules, monthly updates and delay support on design-bid-build and design-build contracts, including the Womack Army Medical Center switchgear job at Fort Bragg and the air handler replacement at Wright-Patterson AFB, both for the USACE Little Rock District. Each schedule keeps non-procurement activities within 20 workdays or 30 calendar days, spreads costs without front-end loading and exports the SDEF file the spec requires. We build the construction baseline schedule to the spec, then keep the monthly schedule updates on time so your pay requests keep moving.
When a modification or a delay moves the finish, we prepare the time impact analysis to AACE 52R-06, with the fragnet, the narrative and the schedule files. On the Fort Randall Major Unit Rehabilitation we work on the other side of the table, reviewing the contractor’s monthly Primavera P6 updates for the USACE project team. A free DCMA 14-point schedule check is open to any contractor who wants a second look at a USACE schedule before it goes in.
Working on other federal jobs? We also build NAVFAC cost-loaded schedules and VA CPM schedules. As a scheduling company, we quote one flat fee per update, or one flat monthly fee for the whole project, within 24 hours. Revisions are unlimited until approved, and we sign an NDA on request. Get My Flat-Fee Quote
USACE scheduling FAQ
No. UFGS 01 32 01.00 10 asks for a qualified Project Scheduler, who can be on your own staff. Section 1.3 calls for at least three previous construction schedules in Primavera P6 on projects of similar size and complexity, and the qualifications go to the Government for approval. If you don’t have that scheduler, ours can fill the role, and we prepare the experience record for your submittal.
A schedule that does not comply can be disapproved, and payment requests can be rejected until it does. If the revisions the Contracting Officer asks for are not made, 10 percent of each pay request can be withheld. That is why we build to the spec from the preliminary schedule on.
Yes. We prepare prospective time impact analyses to AACE 52R-06 for contract modifications and delays, with the fragnet, a narrative and the schedule files.
Draft baselines typically arrive within 7 days. Monthly updates with the narrative come back within 1–2 working days of receiving your progress data.
One flat fee per update, or one flat monthly fee for the whole project. Send the scheduling section and your contract dates, and you get a written flat-fee quote within 24 hours.
We answer the comments and revise the schedule, with unlimited revisions until approved. We sign an NDA on request.
Your next step
Ready to send your USACE scheduling section?
Send section 01 32 01.00 10 from your contract, the drawings or drawing index and your contract dates. You get a fixed price, the deliverables and a delivery date within 24 hours.
- Send your spec and filesThe USACE scheduling section, contract dates and any XER file you already have.
- Get a flat-fee quote in 24 hoursOne fixed price, the deliverables and the delivery date in writing.
- Revise until approvedWe build it to the spec and make unlimited revisions until it is approved.
Why contractors call us
- Primavera P6 and MS Project schedules built to USACE, NAVFAC, VA and DOT specs
- Draft baselines typically within 7 days
- Monthly update and narrative within 1–2 working days of your progress data
- One flat fee per update, or one flat monthly fee for the whole project
- NDA on request
Not sure your current schedule will pass? Get a free DCMA 14-point schedule check. Prefer email? info@consultleopard.com