NAVFAC scheduling consultant for UFGS 01 32 17.00 20 schedules
NAVFAC holds invoice processing until your baseline Network Analysis Schedule is accepted. We build the cost-loaded Primavera P6 baseline, run the monthly updates and prepare time impact analyses under section 1.11.1, for prime contractors on NAVFAC design-bid-build and design-build work.
✓ Flat-fee quote within 24 hours
✓ Schedulers who know USACE, NAVFAC & VA specs
✓ Unlimited revisions until approved
Prefer to talk first? Call (833) 777-6276
NAVFAC and federal contractors who put Leopard on the schedule





26monthly updates on a cost-loaded schedule
Recent NAVFAC result
Fire Alarm Repairs, Marine Corps Logistics Base Albany, GA
NAVFAC fire alarm repairs across more than a dozen buildings. At the August 2026 update, the projected finish matched the contract completion date.
Client: Milton J. Wood Fire Protection
Why NAVFAC schedules come back
Until NAVFAC accepts the baseline, your invoices wait
Under UFGS 01 32 17.00 20, the baseline Network Analysis Schedule must be accepted before NAVFAC processes invoices for anything other than bonds. The cost-loaded schedule then becomes the basis for progress payments. Baselines come back for reasons like these:
Construction activities longer than 20 working days without Contracting Officer approval.
Procurement activities over 60 calendar days, or submittals and Government reviews left out of the logic.
Activity costs that do not add up to the current contract value.
Calendars without the contract’s weather days, work hours or outage windows.
Open ends and hard constraints that hide the critical path.
Quality control, turnover and closeout activities missing from the network.
Each round of comments costs weeks your team planned to spend building.
Get My Flat-Fee QuoteWhy Leopard
NAVFAC schedules from schedulers who work to the spec every month
We know NAVFAC review from the contractor’s side: a baseline that gates your invoices, an update due within 5 calendar days of the data date, and a time impact analysis that has to hold up under section 1.11.1. We have built and updated NAVFAC schedules from Keyport, Washington to MCLB Albany, Pensacola and Orlando.
Spec we build to: UFGS 01 32 17.00 20, Cost-Loaded Network Analysis Schedules, in Primavera P6, on design-bid-build and design-build contracts. Our schedulers bring more than 20 years of CPM scheduling experience.
Our scheduler can serve as your Designated Project Scheduler, with the past Network Analysis Schedules the spec asks for.
Turnaround: draft baselines typically arrive within 7 days, and we revise the schedule, without limit, until it is approved.
Get My Flat-Fee QuoteWhat your NAVFAC scheduling package includes
Designated Project Scheduler: an experienced Primavera P6 scheduler with past Network Analysis Schedules for your qualification submittal.
Baseline NAS: cost-loaded so activity costs add up to the current contract value, with Government activities at zero cost.
Spec checks: 20-working-day construction activities, 60-day procurement, and quality control, turnover and closeout activities.
Calendars: work hours, weather days and outage windows from the contract.
Monthly updates: narrative and longest path within 1–2 working days of your progress data, inside the 5-day submission window.
Time impact analysis: prepared under section 1.11.1 when a modification or a delay moves the finish.
Review support: answers to the Government’s comments, with unlimited revisions until approved.
Built a bid schedule with us? Win the job and keep us on for updates, and you pay no baseline fee. See bid schedule development.
Get My Flat-Fee QuoteFrom contract award to an accepted NAVFAC baseline
Step 01
Send Your Specs
Section 01 32 17.00 20 from your contract, the drawings or drawing index, the schedule of values and your contract dates.
Step 02
Flat-Fee Quote in 24 Hours
Scope, deliverables and the delivery date in writing. Draft baselines typically arrive within 7 days.
Step 03
Approved Schedule
We answer the Government’s comments with you and revise the schedule, without limit, until it is approved.
NAVFAC schedules on recent projects
Replace Lift Station 102 (design-build), Naval Base Kitsap Keyport
Client: Chugach Government Solutions
Keyport, WA
Time impact analyses for a pump redesign and a descoped pipe lining, prepared under UFGS 01 32 17.00 20
Replace Fire Suppression System, Building 1049, NUWC Keyport
Client: Chugach Government Solutions
Keyport, WA
Design-build job: cost-loaded schedule updates from award through the as-built schedule
Fire Safety System Upgrades, NSA Orlando
Client: Milton J. Wood Fire Protection
Orlando, FL
Cost-loaded schedule with 25 monthly updates for fire alarm and mass notification replacement in four buildings
Fire Suppression Repair and Upgrades, DLA Distribution, NAS Corpus Christi
Client: Milton J. Wood Fire Protection
Corpus Christi, TX
Primavera P6 baseline cost-loaded to the contract bid items, with a weather calendar
What our clients say
“Leopard’s updates helped us pass NAVFAC review on the first try. It saved our cash flow and gave our client confidence.”
Neal Jellison, Project Manager
Chugach Government Solutions
NAVFAC CPM scheduling services for prime contractors
Leopard is a NAVFAC scheduling consultant for prime contractors who build under UFGS 01 32 17.00 20, Cost-Loaded Network Analysis Schedules. The spec asks for a Designated Project Scheduler with at least three previous Network Analysis Schedules in Primavera P6, a cost-loaded baseline that matches the contract value, and monthly updates within 5 calendar days of the data date. Invoices other than bonds wait until the baseline is accepted.
Our NAVFAC CPM scheduling work covers baselines, updates and delay support on design-bid-build and design-build contracts, from Naval Base Kitsap Keyport to MCLB Albany, NSA Orlando, Pensacola and NAS Corpus Christi. Each baseline carries the contract’s own calendars, cost loading to the contract bid items and the Government review periods. We build the construction baseline schedule to the spec, then keep the monthly schedule updates on time so progress payments follow the cost-loaded plan.
When a modification or a delay moves the finish, we prepare the time impact analysis under section 1.11.1, with the fragnet, the narrative and the schedule files. On design-build jobs, the schedule also carries the design submittals, because NAVFAC ties the first design submittal to baseline acceptance. A free DCMA 14-point schedule check is open to any contractor who wants a second look at a NAVFAC schedule before it goes in.
Working on other federal jobs? We also build USACE schedules to UFGS 01 32 01.00 10 and VA CPM schedules. As a scheduling firm, we quote one flat fee per update, or one flat monthly fee for the whole project, within 24 hours. Revisions are unlimited until approved, and we sign an NDA on request. Get My Flat-Fee Quote
NAVFAC scheduling FAQ
UFGS 01 32 17.00 20 asks for a scheduler with at least three previous Network Analysis Schedules in Primavera P6, at least one within the last 5 years on a project of similar size and complexity. Our schedulers meet that bar, and we prepare the experience record for your submittal.
Until the baseline Network Analysis Schedule is accepted, NAVFAC does not process invoices for anything other than bonds. The cost-loaded baseline then becomes the basis for progress payments, so delays in acceptance hit your cash flow.
Yes. We prepare time impact analyses under section 1.11.1 for contract modifications and delays, with the fragnet, a narrative and the schedule files.
Draft baselines typically arrive within 7 days. Monthly updates with the narrative come back within 1–2 working days of receiving your progress data, inside the spec’s 5-day window.
One flat fee per update, or one flat monthly fee for the whole project. Send the scheduling section and your contract dates, and you get a written flat-fee quote within 24 hours.
We answer the comments and revise the schedule, with unlimited revisions until approved. We sign an NDA on request.
Your next step
Ready to send your NAVFAC scheduling section?
Send section 01 32 17.00 20 from your contract, the drawings or drawing index and your contract dates. You get a fixed price, the deliverables and a delivery date within 24 hours.
- Send your spec and filesThe NAVFAC scheduling section, contract dates and any XER file you already have.
- Get a flat-fee quote in 24 hoursOne fixed price, the deliverables and the delivery date in writing.
- Revise until approvedWe build it to the spec and make unlimited revisions until it is approved.
Why contractors call us
- Primavera P6 and MS Project schedules built to USACE, NAVFAC, VA and DOT specs
- Draft baselines typically within 7 days
- Monthly update and narrative within 1–2 working days of your progress data
- One flat fee per update, or one flat monthly fee for the whole project
- NDA on request
Not sure your current schedule will pass? Get a free DCMA 14-point schedule check. Prefer email? info@consultleopard.com