VA CPM scheduling consultant for Department of Veterans Affairs projects

VA sections 01 32 16.13, 16.16 and 16.17 ask for an independent CPM consultant that the Contracting Officer approves before your first schedule is reviewed. We prepare that qualification package, then build and update your Network Analysis Schedule in Primavera P6 or Microsoft Project.

✓ Flat-fee quote within 24 hours

✓ Schedulers who know USACE, NAVFAC & VA specs

✓ Unlimited revisions until approved

Prefer to talk first? Call (833) 777-6276

Get a flat-fee quote in 24 hours

Send your VA scheduling section and contract dates and get a flat-fee quote within 24 hours. NDA on request.

    VA and federal contractors who put Leopard on the schedule

    Blue Yonder Inc. logoTrevino Group logoHamilton Pacific Chamberlain logoRoyce Construction Services logoChugach Government Solutions logoKellogg and Kimsey logo

    Approvedby the VA contracting officer’s representative

    Recent VA result

    Surgical HVAC Systems Replacement, Lovell Federal Health Care Center, North Chicago, IL

    Microsoft Project baseline for a surgical HVAC replacement in an occupied hospital, phased around four operating rooms, with night-shift work, infection control and utility outages built into the logic.

    Client: Blue Yonder Inc.

    Why VA schedules come back

    On VA work, the consultant and the schedule both need approval before the job moves

    The Contracting Officer approves your CPM consultant before the first schedule is reviewed. Then the VA reviews the baseline, and each monthly update backs up your payment request. Schedules come back for reasons like these:

    No approved CPM consultant yet, so the first schedule submission cannot start.

    Phasing in an occupied medical center left out of the logic: infection control, utility outages, access notices.

    Cost loading that does not tie to the schedule of values.

    Calendars without night shifts, weather days or outage windows.

    Open ends and hard constraints that hide the critical path.

    Changes and delays added to the schedule with no time impact analysis behind them.

    Each round of comments costs weeks your team planned to spend building.

    Get My Flat-Fee Quote

    Why Leopard

    VA schedules from a consultant that has worked inside VA medical centers

    We know what a VA job asks of a contractor: an occupied hospital, a COR who reads every update, and a payment request that depends on the schedule. We have built and updated VA schedules from North Chicago to West Palm Beach and Houston, and we answer the reviewer’s comments ourselves.

    VA sections we build to: 01 32 16.13, 01 32 16.15, 01 32 16.16 and 01 32 16.17, in Primavera P6 or Microsoft Project. Our schedulers bring more than 20 years of CPM scheduling experience.

    We are an independent scheduling firm, not part of or owned by any contractor, which is what the VA consultant clause asks for.

    Turnaround: draft baselines typically arrive within 7 days, and we revise the schedule, without limit, until it is approved.

    Get My Flat-Fee Quote

    What your VA scheduling package includes

    Consultant qualification package: our scheduler’s experience, past VA and federal projects and sample schedules, ready for the Contracting Officer.

    Network Analysis Schedule: the baseline built to your VA section, in Primavera P6 (XER) or Microsoft Project (MPP), with PDF reports.

    Occupied-hospital phasing: infection-control gates, utility outages, access notices and night-shift work as activities.

    Cost loading: tied to your schedule of values, so each update supports the payment request.

    Monthly updates: narrative, longest path and look-ahead within 1–2 working days of your progress data.

    Time impact analysis: changes and delays measured in the schedule, ready for the COR.

    Review support: answers to the VA’s comments, with unlimited revisions until approved.

    Built a bid schedule with us? Win the job and keep us on for updates, and you pay no baseline fee. See bid schedule development.

    Get My Flat-Fee Quote

    From contract award to an approved VA schedule

    Step 01

    Send Your Specs

    The VA scheduling section (01 32 16.13, 16.15, 16.16 or 16.17), the drawings or drawing index, the schedule of values and your contract dates.

    Step 02

    Flat-Fee Quote in 24 Hours

    Scope, deliverables and the delivery date in writing. Draft baselines typically arrive within 7 days.

    Step 03

    Approved Schedule

    We submit the consultant package, build the schedule and answer the COR’s comments with you, without limit, until it is approved.

    VA medical center schedules on recent projects

    Replace AHU, Building 45, Hines VA Hospital

    Client: Blue Yonder Inc.

    Hines, IL
    10 monthly Microsoft Project updates with a narrative and cost report

    Facility Wayfinding, Lovell Federal Health Care Center

    Client: Blue Yonder Inc.

    North Chicago, IL
    6 monthly Microsoft Project updates and a time impact analysis of three delay events

    Hybrid Operating Room, Richmond VA Medical Center

    Client: Talon Veteran Services

    Richmond, VA
    P6 schedule rebuilt to answer the VA’s review comments, then updated

    VA EHRM Infrastructure Upgrades, Houston VA Medical Center

    Client: Trevino Group

    Houston, TX
    Cost-loaded schedule updates across three towers, the main computer room and campus fiber

    Replace Emergency Generators and Paralleling Gear, West Palm Beach VA Medical Center

    Client: Eau Gallie Electric

    West Palm Beach, FL
    P6 baseline with temporary generators keeping the hospital powered during the changeover

    Emergent Parking Garage Repairs, Huntington VA Medical Center

    Client: Hamilton Pacific Chamberlain

    Huntington, WV
    P6 baseline with day and night shift calendars, planned so the garage stays open

    Demolish Building 9H, Perry Point VA Medical Center

    Client: Equip-Co Unlimited

    Perry Point, MD
    Baseline for abatement, telecom relocation and demolition on an active medical campus

    What our clients say

    “Leopard’s updates helped us pass NAVFAC review on the first try. It saved our cash flow and gave our client confidence.”

    Chugach Government Solutions logo

    Neal Jellison, Project Manager

    Chugach Government Solutions

    Independent CPM consultant for VA construction projects

    Leopard is a VA CPM scheduling consultant for general contractors on Department of Veterans Affairs construction. VA master specification sections 01 32 16.13 (major design-bid-build), 01 32 16.16 and 01 32 16.17 (design-build) ask the contractor to engage an independent CPM consultant, and the Contracting Officer approves that consultant before the first schedule is reviewed. Section 01 32 16.15 for small projects lets you schedule in-house or hire an outside consultant, with the same approval if you hire one.

    As your VA scheduling consultant, we prepare the qualification package, then build the Network Analysis Schedule in Primavera P6 or Microsoft Project. On a medical center, the logic carries what the VA watches: phased work around patient areas, infection-control gates, utility outage approvals and night-shift calendars. Our guide to scheduling occupied hospital renovations shows how we sequence that work, and our construction baseline schedule service covers the first submittal.

    After approval, our VA construction scheduling services cover monthly CPM schedule updates with a narrative and cost-loaded progress that supports your payment request, plus a time impact analysis when a change or a delay moves the finish. We work in the native file the VA receives, XER or MPP, and our scheduling company has done this on VA medical centers in Illinois, Virginia, Texas, Florida, West Virginia and Maryland.

    Working on other federal jobs? We also build USACE schedules to UFGS 01 32 01.00 10 and NAVFAC cost-loaded schedules. Pricing is one flat fee per update, or one flat monthly fee for the whole project, quoted within 24 hours. Revisions are unlimited until the schedule is approved, and we sign an NDA on request. Get My Flat-Fee Quote

    VA scheduling FAQ

    On most VA projects, yes. Sections 01 32 16.13, 01 32 16.16 and 01 32 16.17 require the contractor to engage an independent CPM consultant, and the Contracting Officer approves the consultant before schedules are reviewed. Section 01 32 16.15 (small projects) lets you use an outside consultant or schedule in-house.

    Yes. We put together what the spec asks for: our scheduler’s experience, a list of past VA and federal projects and sample schedules. The Contracting Officer makes the approval decision, and we answer any follow-up questions.

    Both. We build in the software your VA contract and team use and deliver the native file (XER or MPP) with PDF reports. Recent VA work includes Microsoft Project schedules at Lovell and Hines and Primavera P6 schedules at Richmond, West Palm Beach and Huntington.

    Draft baselines typically arrive within 7 days. Monthly updates with the narrative come back within 1–2 working days of receiving your progress data.

    One flat fee per update, or one flat monthly fee for the whole project. Send the VA scheduling section and your contract dates, and you get a written flat-fee quote within 24 hours.

    We answer the comments and revise the schedule, with unlimited revisions until approved. We sign an NDA on request.

    Your next step

    Ready to send your VA scheduling section?

    Send the VA scheduling section, the drawings or drawing index and your contract dates. You get a fixed price, the deliverables and a delivery date within 24 hours.

    1. Send your spec and filesThe VA scheduling section, contract dates and any XER or MPP file you already have.
    2. Get a flat-fee quote in 24 hoursOne fixed price, the deliverables and the delivery date in writing.
    3. Revise until approvedWe build it to the spec and make unlimited revisions until it is approved.

    Why contractors call us

    • Primavera P6 and MS Project schedules built to USACE, NAVFAC, VA and DOT specs
    • Draft baselines typically within 7 days
    • Monthly update and narrative within 1–2 working days of your progress data
    • One flat fee per update, or one flat monthly fee for the whole project
    • NDA on request

    Not sure your current schedule will pass? Get a free DCMA 14-point schedule check. Prefer email? info@consultleopard.com

    Start your quote request

    Attach the scheduling spec section, the drawings or drawing index and your milestone dates. Flat-fee quote within 24 hours. NDA on request.

      Call (833) 777-6276Get My Quote