Construction delay analysis & TIA services

Time impact analysis (TIA) and forensic delay analysis that prove entitlement and support your time-extension requests and claims.

✓ Flat-fee quote within 24 hours

✓ Schedulers who know USACE, NAVFAC & VA specs

✓ TIAs, windows analysis and EOT support

Prefer to talk first? Call (833) 777-6276

Get a flat-fee quote in 24 hours

Tell us about your project. You get a flat-fee quote within 24 hours. NDA on request.

    or email your files to info@consultleopard.com

    Trusted by general contractors on federal, data center and commercial projects

    Royce Construction Services logoHunt Builders Corporation logoKellogg and Kimsey logoChugach Government Solutions logoDonlar Construction logoCrossland Construction logo
    • 64 days

      of delay tied to three specific changes, out of 12 events analyzed

      Moxy Marriott, Asheville, NC · Kellogg & Kimsey

    • Approved

      time extension after our time impact analyses, and Pay App #14 certified

      USACE West Point Public Health Clinic, NY · Royce Construction Services

    • 45 days

      quantified on substantial completion in a delay impact analysis when permits arrived late

      METRO Gold Line BRT, MN · Donlar Construction

    Already have a schedule? Send the XER or MPP for a free DCMA 14-point schedule check: a written narrative with recommendations in 2–3 days, depending on project size.

    59 daysTCO extension, granted

    Recent result

    Residence Inn, Ormond Beach, FL

    Our time impact analysis, built from 26 monthly Primavera P6 updates, supported a 59-day TCO extension. The extension was granted.

    Client: Kellogg & Kimsey

    Why Delay Claims Get Denied

    Construction delays are costing you time, money, and control

    Weather, late design approvals, change orders and scope shifts hit every project. Without a defensible time impact analysis (TIA), each one can turn into:

    Missed Time Extensions.

    Owner Disputes and Claim Rejections.

    Liquidated Damages and Lost Profit.

    Delayed Payments

    Schedule Confusion Across the Team

    We model each delay in your Primavera P6 or Microsoft Project schedule and document it to your contract, so the time you are owed gets approved.

    Get My Flat-Fee Quote

    Our Delay Analysis Services

    We know construction delays, and how to fix them

    Our schedulers prepare TIAs for USACE, NAVFAC and commercial projects: weather, design changes, late approvals and owner-directed scope changes. For Navy work, see our NAVFAC scheduling consultant page.

    Every time impact analysis we prepare traces each delay through the critical path, is modeled in Primavera P6 or Microsoft Project, and is documented to your contract so the reviewer can follow it from cause to completion date.

    Simply put: we document the delay, prove the time and help you avoid a dispute.

    Get My Flat-Fee Quote

    What’s included in our TIA support

    Fragnets inserted into your Primavera P6 or MS Project schedule.

    As-Planned vs As-Built analysis with critical path impact.

    Float loss evaluation and delay window modeling.

    Owner-facing narratives aligned with contractual entitlement.

    Gantt charts, delay diagrams, and supporting exhibits.

    Formatting aligned with agency specs, such as USACE, NAVFAC, VA, DOT.

    Optional add-ons: Claim strategy consulting, Power BI dashboards

    Get My Flat-Fee Quote

    How to get your TIA in 3 steps

    Step 01

    Send Your Schedule

    Send your latest schedule update and delay records: XER, MPP, PDF, letters, RFIs or daily reports.

    Step 02

    Flat-Fee Quote in 24 Hours

    We review the delay events and send a flat-fee quote with scope and delivery date within 24 hours.

    Step 03

    Submission-Ready TIA

    Receive fragnets, narrative and exhibits formatted to your contract, with unlimited revisions until approved.

    Our Process

    How we deliver clarity, entitlement & resolution

    01. Discovery & Delay Documentation

    We collect your baseline schedules, updates, RFIs, change orders, and field reports to build a full picture of project conditions.

    02. Delay Drivers & Fragnet Modeling

    We identify delay drivers and insert fragnets into your Primavera P6 or MS Project schedule to reflect real-world impacts.

    03. Time Impact Analysis, Float & CPM Logic

    We evaluate float loss, delay windows, and shifts in the critical path, fully aligned with agency standards.

    04. Narrative, Causation & Responsibility

    We create owner-facing narratives that clearly tie each delay to its cause, date, and contractual entitlement.

    05. Resolution Strategy & Recovery Support

    We advise on mitigation options and recovery schedules to help you regain control and reduce future exposure.

    See what a defensible TIA looks like

    Ask for a redacted sample when you request your quote. You will see how we structure the narrative, fragnet logic and exhibits.

    Fragnets modeled in Primavera P6 or MS Project.

    Owner-facing narratives aligned with contract language.

    Gantt charts and float loss diagrams.

    Summary of delay logic and time extension justification

    Get My Flat-Fee Quote

    Just mention it in your message.

    Delay analysis results for contractors

    USACE West Point Public Health

    Royce Construction Services

    USACE had rejected the original P6 schedule. We revised the logic and delivered compliant TIAs formatted to UFGS 01 32 01. USACE approved the time extension and Pay App #14 was certified.

    Residence Inn, Ormond Beach, FL

    Kellogg & Kimsey

    26 monthly Primavera P6 updates. Our time impact analysis supported a 59-day TCO extension, and it was granted.

    What our clients say

    “Leopard Project Controls provided a defensible TIA that helped us navigate agency review with confidence. Their analysis for our NAVFAC project was clear, credible, and delivered on time.”

    Neal Jellison, Project Manager

    Chugach Government Solutions

    Delay analysis on recent projects

    Moxy Marriott Hotel

    Client: Kellogg & Kimsey

    Asheville, NC
    Time impact analysis of 12 delay events: 64 calendar days tied to three specific changes

    Gold Line BRT, Woodlane Drive Station Park & Ride

    Client: Donlar Construction

    Woodbury, MN
    Delay impact analysis when permits arrived late: 45 calendar days on substantial completion

    Emergency Operations Center

    Client: Perry-McCall Construction

    Florida Division of Emergency Management
    Electrical gear delay tracked as a fragnet through the schedule updates

    Veditz Building Renovation, Maryland School for the Deaf

    Client: Waynesboro Construction

    Frederick, MD
    Fragnets for the change requests and bulletins across 19 monthly updates

    Facility Wayfinding, Lovell Federal Health Care Center

    Client: Blue Yonder Inc.

    North Chicago, IL
    Time impact analysis of three delay events, with 6 monthly Microsoft Project updates

    Replace Lift Station 102 (design-build)

    Client: Chugach Government Solutions

    Naval Base Kitsap Keyport, WA
    Time impact analyses for a pump redesign and a descoped pipe lining, prepared under UFGS 01 32 17.00 20

    With vs. Without a TIA: the difference is clear

    Without a TIA

    Vague delay justification.

    Claims denied by the owner.

    Liquidated damages or withheld payments.

    Weak negotiation leverage.

    Team confusion and reactive planning.

    Reduced trust with reviewers.

    With Leopard’s TIA Support

    Delay logic modeled in CPM schedule.

    Entitlement backed by contract and analysis.

    Defensible time extension aligned with spec.

    Clear exhibits and narratives drive decisions.

    Proactive schedule control and clarity.

    Faster review, stronger relationships.

    A vague delay justification costs time and money. A documented TIA gets reviewed and approved.

    Get My Flat-Fee Quote

    Construction schedule delay analysis for federal and commercial contractors

    Construction delay analysis shows how a specific event moved your completion date and who is responsible for it. Owners and agency reviewers do not grant time on a narrative alone. They expect a CPM schedule delay analysis that ties each delay to the critical path, the contract and the dates in your schedule updates. When that analysis is missing or loose, time extension requests stall and liquidated damages stay on the table.

    The right method depends on your contract and the stage of the project. A time impact analysis (TIA) inserts a fragnet into the current Primavera P6 or Microsoft Project update to measure a delay as it happens, and USACE projects follow the TIA requirements in UFGS 01 32 01. For delays already behind you, a forensic schedule analysis, such as a windows analysis or an as-planned vs. as-built comparison, measures what happened period by period, and an impacted as-planned analysis can support early negotiation. Our guide to time impact analysis in MS Project walks through the basic steps.

    As your delay analysis consultant, Leopard works for the contractor. Our schedulers review your baseline and updates, check logic and float, model each delay event and write the narrative and exhibits your reviewer needs: fragnets, float loss diagrams, before-and-after Gantt charts and an entitlement summary tied to contract clauses. If your updates have gaps, we fix them first through our monthly schedule update support or start with an independent schedule review, so the analysis rests on a sound record.

    Contractors use our delay analysis services on USACE, NAVFAC, VA and DOT work and on commercial and data center projects. On the Residence Inn in Ormond Beach, our TIA supported a 59-day TCO extension, and it was granted. If you need a firm that can prepare a construction delay claim analysis or respond to an owner’s TIA review, send your latest schedule and delay records. You will get a flat-fee quote within 24 hours, with unlimited revisions until approved. Get My Flat-Fee Quote

    Frequently asked questions

    The one your contract requires. Most federal specs, including USACE UFGS 01 32 01, call for a time impact analysis using a fragnet in the current update. For past delays we use windows analysis or an as-planned vs. as-built comparison. We confirm the method before we start.

    Each TIA is quoted as a flat fee based on the number of delay events and the condition of your schedule. Send your latest update and delay records and we will send a proposal within 24 hours.

    You get a flat-fee quote within 24 hours, and the quote states the delivery date. The schedule is set by the number of delay events and your submission deadline.

    Yes. We work directly in your Primavera P6 (XER) or Microsoft Project (MPP) schedule and return the impacted schedule with the narrative and exhibits.

    We revise the analysis and respond to the reviewer’s comments. Every TIA includes unlimited revisions until approved.

    Yes. NDA on request. We honor every confidentiality term we sign and never name a client or project on our website without permission.

    Your next step

    Ready to get your time extension approved?

    Whether you are requesting a time extension, pricing a change order or answering an owner’s TIA comments, we prove the time with your schedule and your contract.

    1. Send your spec and filesThe scheduling spec section, contract dates and any XER or MPP file you already have.
    2. Get a flat-fee quote in 24 hoursOne fixed price, the deliverables and the delivery date in writing.
    3. Revise until approvedWe build it to the spec and make unlimited revisions until it is approved.

    Why contractors call us

    • Primavera P6 and MS Project schedules built to USACE, NAVFAC, VA and DOT specs
    • Draft baselines typically within 7 days
    • Monthly update and narrative within 1–2 working days of your progress data
    • One flat fee per update, or one flat monthly fee for the whole project
    • NDA on request

    Not sure your current schedule will pass? Get a free DCMA 14-point schedule check. Prefer email? info@consultleopard.com

    Start your delay analysis request

    Send your schedule and delay records and get a flat-fee TIA quote within 24 hours. Unlimited revisions until approved. NDA on request.

      Call (833) 777-6276Get My Quote