Monthly CPM schedule updates in Primavera P6 and MS Project

Progressed schedules, narratives and critical path reports that meet your owner’s spec and keep pay apps moving, on USACE, VA, DOT and commercial projects.

✓ Flat-fee quote within 24 hours

✓ Schedulers who know USACE, NAVFAC & VA specs

✓ Update and narrative in 1–2 working days

Prefer to talk first? Call (833) 777-6276

Get a flat-fee quote in 24 hours

Tell us about your project and update cycle. You get a flat-fee quote within 24 hours. NDA on request.

    or email your files to info@consultleopard.com

    Trusted by general contractors on federal, data center and commercial projects

    Royce Construction Services logoHunt Builders Corporation logoKellogg and Kimsey logoChugach Government Solutions logoDonlar Construction logoCrossland Construction logo
    • 26

      monthly Primavera P6 updates on one hotel project

      Residence Inn, Ormond Beach, FL · Kellogg & Kimsey

    • Weekly

      updates to a Level 3 and Level 5 P6 program we built from scratch, cost-loaded to the schedule of values

      DartPoints CVG data center, OH · Hunt Builders

    • 16

      progress updates since the January 2026 NTP; the November update still forecasts the contract dates

      Utility operating center, Spring Valley, NY · Donnelly Construction

    Already have a schedule? Send the XER or MPP for a free DCMA 14-point schedule check: a written narrative with recommendations in 2–3 days, depending on project size.

    56 daysahead of the baseline finish

    Recent result

    Emergency Operations Center, State of Florida Division of Emergency Management

    We provided project controls and CPM scheduling support: 23 schedule updates plus the as-built schedule. The project team reached final completion 56 days ahead of the baseline date.

    Client: Perry-McCall Construction

    The problem

    What a late or rejected update costs you

    Owners and agencies tie payment to the schedule update. When the update is late, wrong or rejected, the cost shows up fast:

    Pay apps held until the update is accepted.

    Progress that doesn’t match the field or the schedule of values.

    Logic changes and out-of-sequence work nobody explained.

    Reviewer comments that roll into the next month.

    Delays you can’t prove when it’s time to ask for time.

    A disciplined update every period prevents most of this.

    Get My Flat-Fee Quote

    Our approach

    How we run your monthly update

    We collect field progress from your team, verify it, and status the schedule at the data date your contract requires. Then we check the update before it goes to the owner.

    Status and logic: actual dates, remaining durations, percent complete and any logic changes, recorded and explained. Analysis: critical path, float trends and variance against the baseline.

    Reporting: a written narrative to your spec, covering delays, mitigation and changes since the last period.

    Get My Flat-Fee Quote

    What’s included in every update

    A progressed Primavera P6 or MS Project schedule at your data date.

    A written narrative formatted to your spec, such as UFGS 01 32 01.

    Critical path, near-critical and float reports.

    Variance against the baseline and the last update.

    Progress aligned with your schedule of values for the pay app.

    Early flags on delays that may need a time impact analysis.

    Lookahead schedules on request.

    Get My Flat-Fee Quote

    What each owner requires in a monthly update

    Every agency writes its own update rules. We work from the section in your contract, so the update matches what the reviewer checks.

    OwnerSpecWhat the update must include
    USACEUFGS 01 32 01.00 10Periodic update in native Primavera P6 (.xer) with a narrative report and schedule reports. The draft narrative and data file go to the Government at least two workdays before the update meeting. The Contracting Officer can withhold 10% of a pay request until required schedule revisions are made.
    NAVFACUFGS 01 32 17.00 20Cost-loaded P6 schedule updated at a monthly meeting. Each update includes the native XER, scheduling log, narrative, earned value report and cash-flow S-curve. Without an accepted baseline, updates can be returned for record only.
    VAVA 01 32 16.13 (major) or 01 32 16.15 (small)Monthly schedules and reports, a list of every schedule change and the electronic file, submitted with the monthly payment request. Reports are based on total float.
    State DOTsYour DOT’s CPM specificationEach DOT sets its own update cycle, software and narrative format. We work from the section in your contract.
    Commercial ownersContract or owner formatUsually Primavera P6 or Microsoft Project with a narrative and a critical path report each month.

    Spec editions change. We check the edition named in your contract before the first update.

    How it works in 3 steps

    Step 01

    Send your schedule and spec

    Send the current schedule, the baseline and the schedule spec, or tell us about the project on a call.

    Step 02

    Get a flat-fee quote in 24 hours

    One flat fee per update, or one flat monthly fee for the whole project, with the scope, deliverables and reporting dates in writing.

    Step 03

    Get updates ready for review every period

    We update, check and deliver the schedule and narrative within 1–2 working days of receiving your progress data, ready for your owner’s review and your pay app.

    What contractors got from Leopard schedules

    USACE West Point Public Health

    Royce Construction Services

    USACE had rejected the original P6 schedule. We revised the logic and delivered compliant TIAs formatted to UFGS 01 32 01. USACE approved the time extension and Pay App #14 was certified.

    Residence Inn, Ormond Beach, FL

    Kellogg & Kimsey

    26 monthly Primavera P6 updates. Our time impact analysis supported a 59-day TCO extension, and it was granted.

    What our clients say

    “Leopard Project Controls has been a welcomed breath of fresh air, extremely well-versed, talented, and detail-oriented. Their work product for our Progress Schedule Update #7 was truly impressive, especially in light of major design revisions, critical structural RFIs, and weather delays. Thanks to their support and our on-site team’s leadership, we’re trending ahead of schedule and back on track for substantial completion.”

    Kellogg & Kimsey logo

    Ernest G. Floerke, Jr., Project Executive

    Kellogg & Kimsey, Inc.

    “Leopard’s updates helped us pass NAVFAC review on the first try. It saved our cash flow and gave our client confidence.”

    Chugach Government Solutions logo

    Neal Jellison, Project Manager

    Chugach Government Solutions

    Schedule updates on recent projects

    Vehicle Maintenance Shop and Area Maintenance Support Activity

    Client: Benaka Inc.

    Defense Supply Center Richmond, VA
    Cost-loaded P6 schedule, 10 monthly updates

    Fire Alarm Repairs, Marine Corps Logistics Base Albany

    Client: Milton J. Wood Fire Protection

    Albany, GA
    Cost-loaded schedule, 26 monthly updates

    Emergency Operations Center

    Client: Perry-McCall Construction

    Florida Division of Emergency Management
    23 schedule updates and the as-built schedule

    Operating Center Office Addition

    Client: Donnelly Construction

    Spring Valley, NY
    Cost-loaded schedule, 16 progress updates

    EHRM Infrastructure Upgrades, Houston VA Medical Center

    Client: Trevino Group

    Houston, TX
    Cost-loaded schedule updates across three towers, the main computer room and campus fiber

    Replace Fire Suppression System, Building 1049

    Client: Chugach Government Solutions

    NUWC Keyport, WA
    Design-build job: cost-loaded schedule updates from award through the as-built schedule

    Cimarron Pump and Treat System

    Client: O6 Environmental

    Logan County, OK
    Primavera P6 baseline, then 13 progress updates with longest path and look-ahead reports

    Miramar Resort

    Client: Kellogg & Kimsey

    Florida
    Monthly updates with the longest path, a 4-week look-ahead and an execution index

    An update without a scheduler vs. a Leopard update

    Without a scheduler

    Percent complete guessed at month end.

    Logic changes not explained.

    Narrative written at the last minute.

    Critical path not checked.

    Progress doesn’t match the pay app.

    Reviewer comments carry into next month.

    Leopard monthly update

    Progress verified with your field team.

    Every logic change recorded.

    Narrative written to your spec.

    Critical path and float checked every period.

    Progress aligned with the schedule of values.

    Delays flagged early for a TIA.

    Get an update your owner can accept.

    Get My Flat-Fee Quote

    CPM schedule update services for contractors

    Most owners and agencies require a monthly schedule update with every pay application. On USACE work, UFGS 01 32 01 sets the rules (NAVFAC uses UFGS 01 32 17.00 20): a progressed network analysis schedule at the data date, a narrative, and reports on the critical path and float. Commercial owners often ask for the same package in Primavera P6 or Microsoft Project. When the update is late or rejected, the pay app usually waits with it.

    Our CPM schedule update services start with field progress. We confirm actual start and finish dates and remaining durations with your superintendent, then status the schedule and check logic, constraints and calendars before anything goes to the owner. Each update is compared with the approved baseline and the previous period, so changes are explained before the reviewer finds them. Updates come back within 1–2 working days of receiving your progress data. For a step-by-step view of the process, see our guide to preparing monthly schedule updates and progress reports.

    The narrative is where many updates fail review. We write it to your spec: work performed, critical path and float changes, delays and their causes, and the mitigation planned. When a delay starts to drive the finish date, we flag it early so a time impact analysis can be prepared while the records are fresh.

    We run updates weekly or monthly, in Primavera P6 or Microsoft Project, as the schedule update consultant for your team. On a data center expansion in Cincinnati, we maintain the P6 schedule with weekly updates and keep the owner’s monthly Microsoft Project schedule aligned with it. On a USACE Louisville District vehicle maintenance facility at Defense Supply Center Richmond, Virginia, each of our ten monthly updates to Benaka’s cost-loaded schedule includes an earnings report by contract line item. If your project still needs an approved baseline, start with baseline schedule development. Every engagement starts with a flat-fee quote in 24 hours. Get My Flat-Fee Quote

    Frequently asked questions

    We quote one flat fee per update, or one flat monthly fee when we run every update on the project. The fee depends on the schedule size, update frequency and your spec. Send your schedule and spec and you get the quote within 24 hours.

    Yes. We review the current schedule and the baseline first, fix any status or logic problems, and then run the next update from there.

    Actual start and finish dates, progress on active work, and any changes or delays from your superintendent or PM. A short call or a marked-up lookahead is usually enough. You get the update and narrative back within 1–2 working days.

    Primavera P6 or Microsoft Project, whichever your contract requires. We deliver native XER, XML or MPP files plus PDF reports and the narrative.

    Yes. We follow your spec, such as UFGS 01 32 01 on federal work, or your owner’s format on commercial projects.

    Yes. NDA on request. We never name a client or project on our website without permission.

    Your next step

    Ready for your next update?

    Send your schedule and spec. You get a flat-fee quote within 24 hours.

    1. Send your spec and filesThe scheduling spec section, contract dates and any XER or MPP file you already have.
    2. Get a flat-fee quote in 24 hoursOne fixed price, the deliverables and the delivery date in writing.
    3. Revise until approvedWe build it to the spec and make unlimited revisions until it is approved.

    Why contractors call us

    • Primavera P6 and MS Project schedules built to USACE, NAVFAC, VA and DOT specs
    • Draft baselines typically within 7 days
    • Monthly update and narrative within 1–2 working days of your progress data
    • One flat fee per update, or one flat monthly fee for the whole project
    • NDA on request

    Not sure your current schedule will pass? Get a free DCMA 14-point schedule check. Prefer email? info@consultleopard.com

    Start your update request

    Send your current schedule and spec and get a flat-fee quote within 24 hours. NDA on request.

      Call (833) 777-6276Get My Quote