Primavera P6 Work Breakdown Structure
Work Breakdown Structure in Primavera P6
A Work Breakdown Structure (WBS) is a hierarchical subdivision of the project deliverables and project work into smaller, more manageable components. It helps the user to divide a project into logical pieces for the purpose of planning, managing, and controlling the project. In Primavera P6, WBS enables the user to organize the schedule into meaningful sections. To do this, Primavera P6 uses the so-called “child/parent” relationship between elements to enable lower levels to be rolled up and summarized. WBS elements added to the root level element are directly indented to place under the second level of the hierarchy. Each WBS [...]