...
LEOPARD PROJECT CONTROLS

LEOPARD PROJECT CONTROLS

Primavera P6 WBS element

Work Breakdown Structure in Primavera P6

By |September 20, 2022|Categories: Project Controls|Tags: , , |

A Work Breakdown Structure (WBS) is a hierarchical subdivision of the project deliverables and project work into smaller, more manageable components. It helps the user to divide a project into logical pieces for the purpose of planning, managing, and controlling the project. In Primavera P6, WBS enables the user to organize the schedule into meaningful sections. To do this, Primavera P6 uses the so-called “child/parent” relationship between elements to enable lower levels to be rolled up and summarized. WBS elements added to the root level element are directly indented to place under the second level of the hierarchy. Each WBS [...]

Comments Off on Work Breakdown Structure in Primavera P6
Go to Top
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.