LEOPARD PROJECT CONTROLS

The Battery Park City Authority Resiliency

The South Battery Park City Resiliency Project (the “SBPCR Project”) includes all infrastructure construction related to the creation of a flood barrier system (the “Barrier System”) that will be constructed along an identified alignment that extends from the BPC Esplanade (the “Esplanade”) at the west end of 1st Place, along the waterside edge of the Museum of Jewish Heritage (“MJH”), through Wagner Park, and the Pier A Plaza (the “Plaza”), and then extending eastward along the northern edge of the Battery to a terminus at approximately the southwest corner of Battery Place and State Street. The Barrier System will consist of a combination of passive and deployable measures designed to provide flood risk reduction to design flood elevations that will vary between fourteen feet (14’) and nineteen point eight feet (19.8’).

Project Relevance

Leopard Project Controls developed Baseline CPM Schedule and Proposal CPM Schedule for the Project.