LEOPARD PROJECT CONTROLS
Saad
S-Curve Monitoring in Primavera P6
What is an S-Curve? S Curve is a simple graph that plots project costs, hours, units, or any other values of the sorts depending on the need and the requirement. S-curves can be plotted for each of these quantities. Then, we can compare the different S-curves plotted during the lifetime of a construction project to provide valuable insights into the current status of the project. Construction managers commonly use the S-curve because they provide insights into the cumulative budget and actual and remaining values during the entire lifecycle of a construction project. Primavera P6 Professional has a designated function [...]
Schedule Progress Update
After developing and finalizing the project baseline, the next step is to update the project schedule regularly. Updating the progress of the project in Primavera P6 with the actual progress is equally important as planning the project. There are multiple ways of tracking the progress information in Primavera P6. Suggested Steps to a Smooth Progress Update First, create a copy of your original schedule Rename the copy for the new period (this period). Store period of performance to capture previous period information for a cost-loaded schedule. Import progress information into the Primavera P6 schedule file. Progress information can include [...]
Use of BIM in Construction
What is BIM? BIM stands for Building Information Modeling. It is amongst the most recent advancements in the AEC industry. BIM technologies digitally build one or more detailed simulated versions of a building. In a virtual digital environment, BIM simulates the construction process. It digitally/virtually constructs a 3D representation of the original building called the BIM model. After completion, the Building Information Model has the accurate geometry and all the relevant data required for calculation, visualization, and other processes in various construction phases such as design, procurement, and manufacturing to realize the construction. It is important to note that [...]
Claims and Disputes in Construction
Construction Claims During a project lifecycle, usual means cannot solve certain events. For that purpose, the contractor files a request called Claim in order to demand an extension of time, monetary compensation, or both. The issue is settled if the client approves the contractor’s demands and grants him an EoT or reimbursement of cost. In case the client disapproves of the contractor’s requests due to misinterpretation of the problem, the issue gives rise to a dispute. Claims have become an unavoidable issue in the project lifecycle. Sources of Claims As discussed previously, the contractor can file a claim due [...]
What makes a good baseline schedule?
A project baseline is one of the essential project management documents created before the project's execution. It includes the project execution strategy, key project deliverables, activity planned dates, and important milestones. It generally consists of three parts: Scope Baseline Schedule Baseline Cost Baseline What is a Schedule Baseline? A Schedule Baseline is also referred to as a target schedule. It is a vetted copy of the initial project baseline, used to review the project performance and report any variances in the schedule. Furthermore, it creates a path for other relevant project management documents like cost baselines, mobilization plans, and resource [...]
Importance of Primavera P6 in Construction
The construction industry around the world is moving towards more advanced tools and techniques to handle the ever-growing demands, tackle the increase in workload, and efficiently manage resources. With that in mind, one of these sophisticated and essential tools is Primavera P6. Primavera P6 is software owned by Oracle and used by Project Management Professionals. It is used for handling multiple projects and can store up to 100,000 activities with countless resources and target plans. Areas of application A project's lifecycle consists of 5 steps: Initiation, Planning, Execution, Monitoring and Control, and Closing. Each step is crucial for project [...]